Site Type: South West of England
Location: South West of Engl
Services Provided: Design, Manufacture, and Installation
Project Cost: £37,295.96
The project required the creation of a robust, insulated structure to house critical equipment at a water treatment facility. Key objectives included the installation of a weather-resistant enclosure, integration of access points and provision for ventilation. The client supplied a prepared concrete pad, and the task involved delivering a complete structural and cladding solution designed to meet operational and environmental requirements.
A prefabricated steel framework was engineered and installed onto the client’s concrete foundation, providing a stable structural base. Insulated cladding sheets were then fitted to the steel framework, ensuring thermal efficiency and protection from external conditions. To accommodate ventilation, two cutouts were created at either end of the building to fit louvers, ensuring adequate air circulation within the structure. The building’s design also incorporated steel doors for secure and practical access.
Site Type: South West of England
Location: South West of Engl
Services Provided: Design, Manufacture, and Installation
Project Cost: £37,295.96
The project required the creation of a robust, insulated structure to house critical equipment at a water treatment facility. Key objectives included the installation of a weather-resistant enclosure, integration of access points and provision for ventilation. The client supplied a prepared concrete pad, and the task involved delivering a complete structural and cladding solution designed to meet operational and environmental requirements.
A prefabricated steel framework was engineered and installed onto the client’s concrete foundation, providing a stable structural base. Insulated cladding sheets were then fitted to the steel framework, ensuring thermal efficiency and protection from external conditions. To accommodate ventilation, two cutouts were created at either end of the building to fit louvers, ensuring adequate air circulation within the structure. The building’s design also incorporated steel doors for secure and practical access.
Site Type: South West of England
Location: South West of Engl
Services Provided: Design, Manufacture, and Installation
Project Cost: £37,295.96
The project required the creation of a robust, insulated structure to house critical equipment at a water treatment facility. Key objectives included the installation of a weather-resistant enclosure, integration of access points and provision for ventilation. The client supplied a prepared concrete pad, and the task involved delivering a complete structural and cladding solution designed to meet operational and environmental requirements.
A prefabricated steel framework was engineered and installed onto the client’s concrete foundation, providing a stable structural base. Insulated cladding sheets were then fitted to the steel framework, ensuring thermal efficiency and protection from external conditions. To accommodate ventilation, two cutouts were created at either end of the building to fit louvers, ensuring adequate air circulation within the structure. The building’s design also incorporated steel doors for secure and practical access.
Site Type: South West of England
Location: South West of Engl
Services Provided: Design, Manufacture, and Installation
Project Cost: £37,295.96
The project required the creation of a robust, insulated structure to house critical equipment at a water treatment facility. Key objectives included the installation of a weather-resistant enclosure, integration of access points and provision for ventilation. The client supplied a prepared concrete pad, and the task involved delivering a complete structural and cladding solution designed to meet operational and environmental requirements.
A prefabricated steel framework was engineered and installed onto the client’s concrete foundation, providing a stable structural base. Insulated cladding sheets were then fitted to the steel framework, ensuring thermal efficiency and protection from external conditions. To accommodate ventilation, two cutouts were created at either end of the building to fit louvers, ensuring adequate air circulation within the structure. The building’s design also incorporated steel doors for secure and practical access.
Site Type: South West of England
Location: South West of Engl
Services Provided: Design, Manufacture, and Installation
Project Cost: £37,295.96
The project required the creation of a robust, insulated structure to house critical equipment at a water treatment facility. Key objectives included the installation of a weather-resistant enclosure, integration of access points and provision for ventilation. The client supplied a prepared concrete pad, and the task involved delivering a complete structural and cladding solution designed to meet operational and environmental requirements.
A prefabricated steel framework was engineered and installed onto the client’s concrete foundation, providing a stable structural base. Insulated cladding sheets were then fitted to the steel framework, ensuring thermal efficiency and protection from external conditions. To accommodate ventilation, two cutouts were created at either end of the building to fit louvers, ensuring adequate air circulation within the structure. The building’s design also incorporated steel doors for secure and practical access.